EFFLUENT IRRIGATION AND CHLORINATION SYSTEM
Results
Furnish and Install 4,550 LF of 6” DR25 C900 with 69 pop-up sprinkler setups Furnish and Install a Chlorination system and shelter with electrical and storage building.
May 2017 Pecos, TX Municipal
- Town of Pecos City
- Previous/Next Project
- Town of Pecos City